Skip to main content

Barr River, Loch Teacuis

Operation since 01/07/2021
Local Authority Area Highland
Technology Hydro
Installed Capacity 1.7Mw

Sign up for updates

Subscribe to receive the regular CARES Newsletter from Local Energy Scotland with articles, events and news on all things local energy.

Sign up