Projects index
How to use this page
Showing 871-885 of 1723 projects
Project type: Locally/community owned
Installation 1 Of 3 Biomass Boilers At Savoch Farm
Project stage:
Operational
Technology:
Biomass
Capacity:
0.199 MW
Local authority:
Aberdeenshire
Project type: Locally/community owned
Installation 2 Of 3 Biomass Boilers At Savoch Farm
Project stage:
Operational
Technology:
Biomass
Capacity:
0.75 MW
Local authority:
Aberdeenshire
Project type: Locally/community owned
Installation 3 Of 3 Biomass Boilers At Savoch Farm
Project stage:
Operational
Technology:
Biomass
Capacity:
0.95 MW
Local authority:
Aberdeenshire
Project type: Locally/community owned
Installation Fo Solar Photo Voltaic Array Systems To Main Factory Roof and Shed (Part Retrospective)
Project stage:
Operational
Technology:
Solar PV
Capacity:
0.209 MW
Local authority:
Scottish Borders
Project type: Locally/community owned
Installation Of 1 Of 3 Biomass Boilers At Mains Of Inverugie In Existing Shed
Project stage:
Operational
Technology:
Biomass
Capacity:
0.21 MW
Local authority:
Aberdeenshire
Project type: Locally/community owned
Installation Of 2 Of 3 Biomass Boilers At Mains Of Inverugie In Existing Shed
Project stage:
Operational
Technology:
Biomass
Capacity:
0.195 MW
Local authority:
Aberdeenshire
Project type: Locally/community owned
Installation Of 3 Of 3 Biomass Boilers At Mains Of Inverugie In Existing Shed
Project stage:
Operational
Technology:
Biomass
Capacity:
0.175 MW
Local authority:
Aberdeenshire
Project type: Locally/community owned
Installation of 4 biomas boilers at Home Farm Auchmacoy
Project stage:
Operational
Technology:
Biomass
Capacity:
1.21776 MW
Local authority:
Aberdeenshire
Project type: Locally/community owned
Installation Of 4 Biomass Boilers To Dry Gain, Pulses And Woodchips
Project stage:
Operational
Technology:
Biomass
Capacity:
3.8 MW
Local authority:
Aberdeenshire
Project type: Locally/community owned
Installation Of 70kw Biomass Boiler Within Existing Storage Shed
Project stage:
Operational
Technology:
Biomass
Capacity:
0.07 MW
Local authority:
Dumfries and Galloway
Project type: Locally/community owned
Installation Of 82.8 Kwp Ground Mounted Solar Photo Voltaic Array
Project stage:
Operational
Technology:
Solar PV
Capacity:
0.0828 MW
Local authority:
Scottish Borders
Project type: Locally/community owned
Installation Of 990kw Biomass Boiler and Flue (In Retrospect)
Project stage:
Operational
Technology:
Biomass
Capacity:
0.99 MW
Local authority:
Perth and Kinross
Project type: Locally/community owned
Installation Of A 45.51 Kwp Solar PV Array Consisting Of 111 Individual Panels Across A Single Pitched Roof Area
Project stage:
Operational
Technology:
Solar PV
Capacity:
0.04551 MW
Local authority:
Stirling
Project type: Locally/community owned
Installation Of A 73.39 Kwp Solar PV Array Consisting Of 179 Individual Panels Across A Single Pitched Roof Area
Project stage:
Operational
Technology:
Solar PV
Capacity:
0.07339 MW
Local authority:
Stirling
Project type: Locally/community owned
Installation Of A Replacement Wind Turbine and 150no Solar Panels 1
Project stage:
Operational
Technology:
Onshore Wind
Capacity:
0.08 MW
Local authority:
Aberdeen City